RESUME CARMEN RUBIO Name:CARMEN B. RUBIO
Title:Senior Lead Planner Scheduler
Education:B.S., Industrial Engineering
Universidad Católica Andrés Bello, Caracas,
Venezuela
Short Courses: Projects, Planning and
Control, Universidad Simón Bolívar; Cost Engineering: Investment cost
analysis and evaluation of projects – Simón Bolívar University
Special
Training:
Primavera P-6.0 Primavera P-3.0: Planning and Scheduling with P-3 IMS and
Advanced P-3 Artemis 2000: ARTEMIS System 2000 for projects planning and
control – Metier de Venezuela S.A
Affiliations:Member, Venezuelan Board
of Engineers (Colegio de Ingenieros de Venezuela)
Contact
Information:
cell
phone: 832-276-5736, Home phone: 281-693-5785
Address:
4326 Copper Sky Ln, Katy, Tx, 77494
E-mail
address: cserra5@comcast.net
More than 25 years
of experience in the oil & gas, hydroelectric, LNG, refinery,
petrochemical, and power industries. Duties included making integrated
schedules for EPC projects and controlling them during FEED, detailed
engineering, procurement and construction. Proficient with P6.8.2 and
Netpoint software. Good skills in coordinating Interactive Planning sessions,
elaborating EPC Schedules with different levels of detail, good teaching,
supervising and Teamwork. Planning/Scheduling
assignments include: JACOBS ENGINEERING-
Currently working ·
Senior Lead
Planner Scheduler, Leader of 3 schedulers in a EDCP (East Domestic Crude
Plant project)
This project is an addition of a new 150,000 BPSD Crude Unit to be installed
in the Flint Hills Corpus Christi East Plant
refinery in Corpus Christi. Additionally, as a result of the new crude slate
to be processed, several adjustments were made to the downstream process
arrangement. These are: new Naphtha Stabilizer of the Hydrobon Unit.
Installation of a new LPG treatment facility. Other of these
adjustments is the restart of the currently idle Isomerate Splitter and
the BTX revamp. Finally the Offsite portion included new
storage tanks, spheres and pumps. Responsibilities included Developing Phase
2, 3 (FEED) and Phase 4(Detail Engineering and Procurement cycle detailing by
REQ number) Schedules, updating, analyzing results of update and impact of
change orders, Reporting and giving alerts and recommendations. Working with
P6.8.2 program in the client database. ·
Senior Lead
Planner Scheduler, HYDROCRACKER REACTORS REPLACEMENT This project
consisted in the replacement of the existing Unit Reactors and extension of
all required infrastructure to the new reactors location including: piping,
instrumentation, pipe rack, utilities, etc., new addition of Heat Exchangers
The project will install the new piling, foundations, table top, new reactors
stair with a goal of completing all activities pre-TA. Responsibilities
included Developing Phase 3 and Phase 4 Schedules, updating, analyzing
results of update and impact of change orders, Reporting and giving alerts
and recommendations. Working with P6.8.2 program in the client database.
Senior Lead Planner Scheduler, Caustic Line Replacement – Conceptual Phase,
Shell, Deer Park, Texas. Responsibilities included developing schedule.
Senior Lead Planner Scheduler, Crude Expansion Project, HTU-5, Motiva, Port
Arthur, Texas. Responsibilities included developing detail engineering
schedule, updating and reporting .
Senior Lead Planner Scheduler, DCS/SIS Control System Modernization, Shell,
Puget Sound, Washington. Responsibilities included developing
Define/Execute schedule and schedule updating. AUDUBON
ENGINEERING
Senior Planner/Scheduler Engineer, Gathering’s 150 MMSCFD Gas Processing
Plant Project, Enbridge, Allison, Texas. Scope included detailed
engineering and procurement. Responsibilities included developing
schedule at level III of detail engineering and procurement of equipment;
controlled project by updating the schedule bi-weekly; progress reports
indicating physical progress; change orders control; all using Primavera P
6.2.
Senior Planner/Scheduler / Controller, 120 MMSCFD Cryogenic Gas Expansion
Project, Chisholm Gas Processing, Fayette County, Texas. Scope included
processing plant, detailed engineering, procurement, and construction.
Responsibilities included developing schedule at level III for detail
engineering, procurement of equipment, and construction; controlling project
by updating the schedule bi-weekly; progress reports indicating physical
progress; change orders control; all using Primavera P 6.2
Senior Planner/Scheduler, 800 MMSCFD Cryogenic Gas Processing Plant, Energy
Transfer Company (ETC), Jackson County, Texas. Scope included detailed
engineering and procurement. Responsibilities included developing the
schedule at level III for detail engineering and procurement of equipment;
controlling project by updating the schedule bi-weekly; progress reports
indicating physical progress; change orders control; all using Primavera P
6.2. The Procurement schedule was done detailing by REQ and following up the
delivery of vendor drawings accordingly the corresponding modeling area, this
permitted an accurate schedule for ISOS issue. The Equipment delivery was
scheduled and followed up by area and tag number accordingly the dates
required at site.
Senior Planner/Scheduler, Kingston-Battlefield Project Phase II, Enterprise,
Texas. Scope included detailed engineering, procurement, and construction of
a chemical plant. Responsibilities included schedule for detail
engineering, procurement, and construction at level III; progress reports
indicating physical progress; all using Primavera P 6.2 KBR
Senior Planner/Scheduler Engineer, Ras Tanura Integrated Project – FEED
Stage, Dow/Saudi Aramco, Saudi Arabia. There are several Petrochemical and
Refinery Units integrating the complex on a green field. Responsibilities
included scheduling, controlling, and reporting on five of the petrochemical
plants using P 6.2 and making follow up of Licensors. ZURQUI
CONSTRUCTION SERVICE
Construction Planner/Scheduler, Art Studios Building, Florida International
University. Responsibilities included schedule and control of a
construction at level III; progress reports indicating physical progress; all
using MS Project.
Production Planner / Controller, Multiple Projects. Responsibilities
included scheduling all projects including design, production, and delivery;
progress control, production control, and supplier control. LA
ELECTRICIDAD DE CARACAS
Senior Planner/Scheduler, Sloped Lands Stabilization Project, Substation
Pedrera. C.A. La Electricidad de Caracas, La Trinidad, Caracas,
Venezuela. Responsibilities included supporting bidding process,
project planning and control, elaborating progress reports to management,
design of control procedures for subcontractors, control of subcontractors.
Senior Planner/Scheduler, High and Low Tension Network Plans Digitalization,
C.A. La Electricidad de Caracas, Caracas, Venezuela. Scope included
field survey and digitalization of electrical and civil infrastructure of the
distribution network of whole Metropolitan Area. Responsibilities included
supporting bidding process, project planning and control, elaborating progress
reports to management, design of control procedures for subcontractors,
control of subcontractors.
Senior Planner/Scheduler, Substation Expansion and Upgrade, Longa
España. Scope included procurement of a new transformer.
Responsibilities included supporting bidding process, project planning and
control, elaborating progress reports to management, design of control
procedures for subcontractors, control of subcontractors.
Senior Planner/Scheduler, 230/69 kV Encapsulated Transformation Train inside
the S/E Pedrera Installation. Scope included increasing the total installed
capacity. Responsibilities included supporting bidding process, project
planning and control, elaborating progress reports to management, design of
control procedures for subcontractors, control of subcontractors. MARSHALL
Y ASOCIADOS
Planner/Scheduler, Modular Prefabricated Gas Compression Plants (6), Offshore
Platforms, PDVSA, Maracaibo Lake, Venezuela. Responsibilities included
preparing an integrated schedule for the six compression plants including
detail engineering, procurement, and fabrication of modules, controlling
progress during the three stages, expediting control on manufacturers and
suppliers.
Planner/Scheduler, NURGAS (New Venezuelan 30” diameter Gas Pipeline Network,
PDVSA, Venezuela. Responsibilities included schedule and control of detailed
engineering, responsible for design procedures for control of subcontractors
and progress control of 3 subcontractors selected. It was used the project
planning and control system Artemis main frame integrating scheduling and
cost control. NOUEL
INGENIEROS
Planner/Scheduler, LNG Marine Terminal, Jose Cryogenic Complex, PDVSA, Eastern
Venezuela. Scope included detailed engineering, loading dock with a 40 x 50 m
platform, and a 191,300 m access trestle. Responsibilities included
scheduling, project controls (physical progress and cost control),
productivity, M-H control, progress reports.
Planner/Scheduler, Uribante – Caparo Hydroelectric Complex, CADAFE,
Venezuela. Scope included master plan development stages (3) of the
facilities of the which covered 3 hydroelectric power generation plants, 4
dams and 3 water basins. Responsibilities included starting operations using
new schedule software. Developing schedule and performing activities of
progress control and control of M-H. TECNOCONSULT
Planner/Scheduler, Project Uribante – Caparo – Third Stage, CADAFE,
Venezuela. Scope included raising two earth dams, each about 130 m
high, one common water basin, and a 771.000 kW capacity hydroelectric power
plant. Responsibilities included starting operations using new schedule
software; developing schedule and performing activities of progress control
and control of M-H. Special Fields of Knowledge:
Integrated
Schedules for EPC projects during FEED, Detailed Engineering, Procurement and
Construction stages. Planning and Progress Control, Cost Control and
Reporting. Proficient with computers in the
current used software: MS Excel, MS World, MS Power Point, MS Project,
Primavera Sure Track, Primavera Expedition, Primavera P-3.0 , P6.2 and P6.8.2 Languages:
English Spanish Employment History:
Jacobs2012 – Date Senior Lead Planner
Scheduler Audubon2010 – 2012 Senior
Planner/Scheduler Engineer KBR2008 – 2009 Senior
Planner/Scheduler Engineer Zurqui Construction
Services Inc Miami, Florida2005 – 2006 Construction
Planner/Scheduler Engineer Transition from
Venezuela to USA2003 – 2005 C.A. La
Electricidad De Caracas1998 – 2003 Senior
Planner/Scheduler Giz Studio de
Venezuela, S.A.1994 – 1998 Owner and Director Caronhi Ingenieros
Consultores, S.A.1991 – 1993 Project Controls
Lead Marshall y
Asociados, C.A.1987 – 1991 Planner/Scheduler Nouel Ingenieros
Consultores, C.A.1982 – 1987 Planner/Scheduler
Engineer Tecnoconsult, S.A.1980
– 1982 Planner/Scheduler
Engineer |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Intermediate |
|
|
Spanish |
Fluent |
|
|
|